Click Drain 300 Series

CLICK DRAIN® 300 by Heelguard

The original architectural stainless steel Heelguard with the added piece of mind of industry leading slip resistance. This innovative grating with a standard 5mm aperture also incorporates a fuss-free bolt-less “Friction Lock” system to secure the grating into place whilst allowing easy removal when required. Available in grade 304 or 316 with load classes from A-D as per AS3996.

Technical Data

Specifications

Load Class

Material 304 SS
Length (mm) 1000

Material 316
Length (mm) 1000

Material 304 SS
Length (mm) 1000

Material 316 SS
Length (mm) 1000

Material 304 SS
Length (mm) 1000

Material 316 SS
Length (mm) 1000

Material 304 SS
Length (mm) 1000

Material 316 SS
Length (mm) 1000

Certifications

All Grating & Inserts:

Bicycle tyre penetration resistance (AS3996 – Clause 3.3.6)

Wheelchair and walking cane safety (AS1428.2 – Clause 9)

Surface openings in pedestrian areas (AS3996)

Anti Slip Grating

Wet Pendulum Test (AS4586:P4)

Wet-Barefoot Inclining Platform Test (AS4586:C)

Oil-Wet Inclining Platform test (AS4586:R11 – Parallel)

Oil-Wet Inclining Platform Test (AS4586:R12 – Perpendicular)

CLICK DRAIN 300 CHANNELS
The Future of Plumbing!

  • 1 & 2 metre channel lengths – For fast and more accurate install procedures.
  •  Lightweight compared to traditional polymer/concrete. Stainless steel channels will not crack or shatter.
  •  Revolutionary ‘click’ together channel lengths and components.
  • 45 & 90 degree corners available.
  • Full profile movable outlets give flexibility on site using conventional tools or hole saws (inox blade required).
  • Multiple grate & insert options.
  • Full profile joiner sections.
  • Loose end caps allow for simple drain terminations.
  • Grates up to load class D (AS3996) available.
  • Revit files also available upon request.

Technical data
2 3

Projects that use Clickdrain

Featuring an innovative and sustainable cross laminated timber design, the new Civic Precinct will bring together staff from seven Geelong offices to drive collaboration, reduce costs, and future-proof the city’s workplace needs. The 6-storey building will include active public spaces, co-working spaces, retail and food tenancies, and end-of-trip facilities.

The 271 million dollar stage 3 development included a new 5,000 seat multi-purpose Show Court Arena (Kia Arena), Centrepiece, a new 1,000 seat function and media centre with function rooms, pre-event spaces, interview rooms, a 250-seat auditorium, and broadcast studios. The works also added a central logistics hub including a kitchen and loading dock.

Stage One of the development, known as Coppins Corner is a historical local reference to the 1850s Richmond and Cremorne identity George Coppin – includes a split-level tower of 15 and 12-storeys, featuring 209 one, two, and three bedroom and SoHo-style apartments, with retail and hospitality located on the lower levels.